Posted on September 15, 2015 @ 08:49:00 AM by Paul Meagher
I'll probably just blog about work on the farm and my leisure pursuits this week. Not much time for research work.
Yesterday I worked on stringing the main training wire through the trellis posts. The photo below is my setup for running wire.
I also have ground anchors in the yellow boxes that I installed behind each trellis end post. I drilled out a hole at the top of each end post and wired the top of the end posts to the ground anchors. The training wire gets fully tensioned when I anchor in the end posts.
I caught a nice sunset in the vineyard last night.
|